Electronic Library
Navigation Top Image
  • Home
  • Overview
  • Technology Mall
  • Electronic Library
  • Summary Report Submittal
  • Final Report Writing Guide
  • Success Story Instructions
  • Commercialization Pilot Program
  • SBIR Sally Says…
  • Schedule Of Events
  • Points Of Contact
  • News/Updates
  • Glossary
  • Links
  • Contact Us
  • Small Business Listing
  • Small Business Area
  • Prime Contractor Area
  • AF SBIR/STTR Topic Pre-Release
  • Current DoD SBIR/STTR AF Solicitation
  • Administration Portal

  • A Guide for Writing Final Technical Reports

    A guide for writing your FINAL report at the end of your Phase I or II contract.
    ( 1 )

  • Readiness Level Presentations

    Powerpoint presentations on the Business, Customer, Manufacturing and Technology Readiness Levels that are critical for SBIR Success.
    ( 3 )

  • SBIR / STTR Advantage

    SBIR/STTR Advantage Quarterly Newsletters
    ( 36 )

  • SBIR / STTR Success Stories (Innovation)

    SBIR/STTR projects that have successfully met Air Force SBIR/STTR technology program requirements in Phase II as well as completed Phase I projects with clearly outstanding potential for Air Force or DoD use.
    ( 59 )

  • SBIR / STTR Success Stories (Transition)

    SBIR/STTR technology that has transitioned into an Air Force system or subsystem, or technology originally developed through an Air Force SBIR/STTR project that has transitioned into another DoD agency system or subsystem.
    ( 44 )

  • SBIR/STTR Brochures

    SBIR and STTR Phase I and II Brochures
    ( 6 )

  • SBIR/STTR Logo

    AF SBIR/STTR Logo
    ( 1 )

  • SBIR/STTR Outreach Info

    Briefings, Conference Information, etc.
    ( 2 )

  • Technology Highlights Archive

    Technologies which have been highlighted in the past.
    ( 0 )